2026-07-07
Following up on the implementation of the second irrigation cycle in the Belloran development networks, and concluding the first irrigation cycle at the Qanjra dam within the group of surface dams in the northern plain
The Water Resources Directorate in Latakia continues to carry out the second irrigation cycle work in the Bellouran development networks, including openings on the main line MP1 Bellouran, line MP1-1 Al-Harajiya, and the first branch of the fourth network MP1-4-1 Zaghrin, in addition to supplying elevated areas on lines MP1-6-1 (Al-Hariqa, Zaghrin, Haret Beit Kabibo), MP1-6-2 (Zaghrin School), MP1-6-3 (Al-Jamasa, Shir Al-Habs, Haret Beit Deyoub), and MP1-6-4 (Al-Shama'a, Nabaa Al-Rumman, Wata Zaghrin), ensuring water reaches all areas according to the scheduled plan.
read more >>