The Raqqa Water Resources Directorate continues to carry out maintenance and rehabilitation work on irrigation networks.
Among the most prominent completed works are:
Al-Murtaha Canal in Al-Rajm: 120 m³ of soil was transported and spread in two sections, compacted in layers using a bulldozer, and the section was trimmed using a roller.
WC7NR4 Canal – Al-Alam Roundabout (Al-Furusiyah): The industrial work at the beginning of the irrigation channel was addressed by the carpentry workshop, after the site was cleared using a JCB bulldozer.
Dredging works: 700 meters of HH9 Canal in Rabi'ah and 500 meters of Canal 42 in Al-Jadidat.
The Directorate of Water Resources affirms that its staff will continue to carry out maintenance, dredging, and rehabilitation works, contributing to improving the efficiency of irrigation networks and serving the agricultural sector.