The Raqqa Water Resources Directorate continues carrying out maintenance and rehabilitation work
Emergency works: Clearing the inlets and outlets of two culverts in the village of Mushayrifa and clearing 50 meters of the drainage channel to limit water from reaching agricultural lands.
Sector 1: Fixing two sinkholes and two breaks on the Saleh Canal in Hattin Farm, including excavation, backfilling, leveling, and compaction works.
Sector 2: Fixing a sinkhole and removing cracked concrete on the Mislon Canal, filling the site, and restoring the canal to service.
Sector 4: Clearing the Ali Bayram drainage channel in Al-Karamah for a length of 200 meters.
Sector 5: Clearing a main drainage channel in Al-Dalha for 150 meters.
Pumping station works:
Calibrating the main feed switch to the third position at the First Wadiyan Station and installing a new seal on the first pump, calibrating it, and putting it into service.
Maintenance and cleaning of control room equipment and machinery at West 3, Al-Yamama, and Najd pumping stations by the rotating shifts.
Lubrication of the pumping units at the First Wadiyan Station.
Installing two pistons for the second group pump RC4 at the Al-Karamah Station and putting it into service.
Installing three pistons for the second group pump RC3 at the Al-Hamrat Station and putting it into service.
The directorate continues its fieldwork in various sectors and stations, enhancing the readiness of the irrigation and drainage system and ensuring continuity.