The most important works completed in the Water Resources Directorate in Raqqa Gover
The Directorate of Water Resources continues its work within the irrigation project in the governorate, as part of the maintenance and rehabilitation of irrigation and drainage networks and pumping stations.
- Ghannam Canal/Al-Qallabat Branch: Earthmoving, backfilling, and leveling work was completed in preparation for concrete pouring.
- Al-Hashim Well, Al-Lour Canal Site: Cavities were repaired using appropriate engineering techniques.
- Gates Workshop: The gearbox for regulator 14 was installed along with the appropriate bases and channels. The second gate on the same regulator was also repaired and maintained.
- Al-Maghla Pumping Station: Welding work was carried out, the oil in the third unit was changed, and the base for the fourth vacuum motor was prepared.
- The 6kV cells at the main Raqqa station were serviced, and the appropriate screed was replaced at the Yamama station.