Thanks to the efforts of the maintenance workshops.. cleaning the main canal in the third sector in preparation for the winter agricultural season
Maintenance workshops in the Directorate of Water Resources in Deir Ezzor – Sector Three, continue their field work to keep the water channels ready and improve their efficiency, in preparation for the winter agricultural season.
In this context, the workshops carried out cleaning and desilting of the main canal, starting from the intake of Branch Eight up to the intake of Branch Twelve at the Clay Village bridge, covering a length of 400 meters. This included removing accumulated dirt and silt from inside the canal.
The aim of this work is to improve the flow of irrigation water and ensure it reaches the farmlands as needed, while reducing water waste. This contributes to meeting farmers’ water needs and preparing the channels for the winter agricultural season efficiently and ready for use.
These efforts are part of the continuous work carried out by the directorate to maintain the safety of water facilities and enhance the efficiency of the irrigation system, supporting the agricultural sector and serving the farmers.