Rehabilitation of Maizila Dam with a storage capacity of 10 million cubic meters to boost rainwater harvesting
The Water Resources Directorate in Deir Ezzor has completed maintenance and rehabilitation work on the Maizila Dam in the desert, aiming to improve its technical and structural readiness to receive rainwater and floods, and to enhance the use of water resources in the area, after about 15 years without any maintenance work.
The work included maintaining the dam body, gates, and valves, filling and repairing cracks and damages that appeared in its structure, which strengthens its structural safety and efficiency in storing water.
The dam is important due to its storage capacity of about 10 million cubic meters, and its role in collecting rainwater and floods to use during dry periods, providing an important water source for the desert residents and livestock breeders to water their animals, supporting their stability and preserving the livestock.
The dam rehabilitation comes as part of the General Authority for Water Resources' efforts to rehabilitate water harvesting facilities and improve their readiness, enhancing the use of rainwater and contributing to water resource management and reducing the risks of floods in the region.