Rehabilitating the water supply channel to Zeta Dam, 12 kilometers long, to boost the water supply
The Homs Water Resources Directorate has started carrying out rehabilitation work on the water supply canal to the Zayta Dam, starting from the main intake on the Orontes River, with a length of about 12 kilometers and a maximum discharge capacity of up to 8 cubic meters per second, according to the available inflows in the river.
The work includes applying a concrete lining to the damaged sections of the canal, maintenance of the metal intakes and main gates, as well as necessary maintenance of the siphon and rehabilitation of expansion and contraction joints, which enhances the canal's efficiency and its water transport capacity.
The project aims to support water storage in the Zayta Dam, which serves as a balancing reservoir to secure drinking water for the cities of Homs and Hama when the Orontes River inflows decline, especially during dry years and the summer months, as well as to support the supply of Ain al-Tanour with water from the dam.
The General Authority for Water Resources extends its thanks and appreciation to the staff of the Homs Water Resources Directorate for their efforts in carrying out rehabilitation and maintenance works, which contributes to enhancing the efficiency of water facilities, supporting the stability of drinking water sources, and improving services provided to citizens.