Preparing for the winter season: maintenance of the lower spillway gates at Salhab Dam
Hama, as part of the regular maintenance plan for dam facilities and in preparation for the upcoming winter season, the Water Resources Directorate in Hama continues maintenance work on the lower spillway of the Salhab Dam, aiming to ensure its readiness.
The maintenance work is part of the routine measures carried out by the directorate to maintain the safety of dams and their water facilities, and to boost their readiness to handle the rainy season.
The work includes carrying out the necessary maintenance for the spillway and preparing the lower spillway to ensure its continuous proper operation, and enhancing the dam's readiness to receive water inflows during the winter season.
The Water Resources Directorate in Hama affirms the continuation of monitoring and regular maintenance work for various water facilities, contributing to preserving their safety and making the most of their use.