Ongoing work to reinforce the banks in Sector Seven and protect farmland in Deir ez-Zor province
We welcome specialized companies to participate in the tenders. Please see the terms and deadlines.
Tender detailsFor inquiries or to file a complaint
The Water Resources Directorate in Deir ez-Zor continues the dredging and cleaning of drains in Sector Seven as part of its plan to improve the efficiency of the agricultural drainage network and enhance its readiness, ensuring better water flow.
The work includes removing silt, weeds, mud and accumulated deposits from the drains, which improves water flow and helps lower water levels in agricultural lands.
This work helps reduce flooding and soil salinity, and protects land and crops from damage caused by high water levels, supporting stable agricultural activity and assisting farmers.
The General Authority for Water Resources extends its thanks and appreciation to the staff of the Water Resources Directorate in Deir ez-Zor and its workers for their field efforts and dedication in carrying out the clearing work, and for utilising the necessary machinery to complete it according to the planned schedule.