Emergency repairs and rehabilitation of irrigation lines within the Al-Safraqia Dam networks
Within the framework of the maintenance plan and rapid response to emergency faults, the technical workshops continued to carry out excavation and repair works on several irrigation network lines in the Abu Sakhr, Bustan Qaban, and Rasiyun sectors. The works included replacing damaged asbestos sections and installing valves and irrigation inlets with all necessary technical equipment.
These works are part of the ongoing efforts to enhance the efficiency of irrigation networks, ensure stable water supply, and maintain continuous service in the best possible way during the agricultural season.